FRAMEWORK REALIZATION AND INSTALLATION
The railway bridge will be installed along the railway line Genova – Sampiedarena. The bridge has a lenght of 18 meetrs and is a part of idraulic adjustment of the small river to avoid the flooding with heavy rain.
CLIENT