FRAMEWORK REALIZATION AND INSTALLATION
16 Meter lenght metallic girder bridge with two railways. It was installed on RFI Roma – Formia railway over the Ninfa river to replace the old one.
CLIENT
16 Meter lenght metallic girder bridge with two railways. It was installed on RFI Roma – Formia railway over the Ninfa river to replace the old one.