FRAMEWORK REALIZATION AND INSTALLATION
The bridge is at metallic grider with double railway with a lenght of 30 meters. It was installed along the RFI Roma – Formia railway. The operation is a part of railway safety maintenance in the San Biagio municipality.
CLIENT